The Project

In 2021, Cardiff City Council released ‘The One Planet Cardiff Strategy’, setting out its plans to make Cardiff a carbon neutral city by 2030 as part of the UK’s overall net zero target.

As part of this strategy, the Council is continuously looking at ways to reduce the carbon footprint of its highways repairs and resurfacing. The A470 resurfacing scheme in Cardiff was a pioneering project, showcasing the potential for carbon neutral resurfacing through innovation and collaboration.

Main contractor Miles Macadam worked with Cardiff City Council and other local contractors, including the Jet Plant regional team in the South West, to maximise materials recycling and reduce the whole life carbon cost of the project.

The Approach

Jet Plant supported the objective to minimise the environmental impact of the works, returning a total of 1,510 tonnes of road planings back to plant for recycling into coated materials.

Other local contractors also worked together to use old and recycled materials, including scrap metals from across Wales, such as end of life cars. This metal was melted down to create durable and sustainable steel aggregate which was used to replace the quarried stone.

The majority of the planing was completed using 2.2m planers from the Jet Plant fleet, with three operators and a banksman to maintain quality and safety. A 350mm planer was also used for fine detailing and to speed up the operation.

Using performance trackers on 2.2m planers, Jet Plant’s South West team was able to report on every aspect of the project including water usage, fuel usage, uptime and downtime, to ensure Cardiff City Council’s targets for the project were met.

Jet Plant also put in place measures to minimise carbon footprint by using local sub-contractors for haulage, extra tippers and road sweepers – all working to Jet Plant’s standards with annual audits to monitor and maintain performance.

Low carbon resurfacing

The Results

The recycled road planings, local sub-contractor network and performance tracking all helped to improve performance and reduce the whole life carbon cost of this best-practice project, which was completed over six non-consecutive nights within a nine-day period.

1

Working on one of the main roads into Cardiff, night works were essential to minimise disruption as much as possible.

2

In total, the A470 resurfacing produced 66 tCO2e emissions – made possible through close collaboration, performance innovation and reliable monitoring to enable accurate reporting in line with the Council’s carbon neutral strategy.

3

Miles Macadam has complete confidence in the results expected of Jet Plant, building on the trust developed over more than ten years working together across Jet Plant’s unrivalled UK network.

Testimonials

We’ve used their smallest planers right up to their largest planers, depending on the nature of the project and every time have been delighted with the results of the works. They’re a fantastic company to work with.

Area Manager

It can sometimes be the case that we approach them with a project and ask for their opinion on what planing and sweeping equipment we need and they always come up with a solution that delivers.

Contracts Manager

I have used Jet Plant for 21 years now since my very first day – all these years later and I have no intention of going elsewhere. Time after time they deliver, all while providing outstanding customer service.

Contracts Manager

As our projects are so varied so are our requirements, yet every single time Jet Plant Hire come through, even with minimal notice, providing an excellent service.

Contracts Director

We find that they are always happy to accommodate whatever our requirements may be, while making the whole process seamless from start to finish.

Commercial Manager

When it comes to Jet Plant Hire, nothing is too much. I have worked with them for over 16 years now and their reputation remains the same; hands on, available and reliable. 

Area Manager

Jet Plant Hire has been one of our core planing equipment providers for over a decade now and, no matter the size and scale of the project, they deliver every single time.

Contracts Manager

I cannot fault Jet Plant Hire, they are excellent and an invaluable partner to us and we’re very grateful for their continued efforts.

Contracts Manager

Excellent service, highly efficient and the highest of quality – all words I associate with Jet Plant Hire. Our experience from day one, back in 2012, has been nothing but fantastic.

Contracts Director

Jet Plant are fantastic – a reliable, easy to deal with, friendly partner that consistently provides us with outstanding customer service. They are without doubt our supplier of choice for planing equipment.

Commercial Manager

Request Info

Unsure of which machine to hire? Leave some project details and our expert team will support in finding your Jet Plant solution.

Quick Quote

Want to understand more about your project costs? Get an instant approximation with our Jet Plant Quick Quote.